Vishnu Prakash R Punglia Limited (NSE: VPRPL | BSE: 543974)

By Raveendran R | Updated on:

Source: Vishnu Prakash R Punglia Limited Annual Report FY 2025-26 (Fiscal Year Ended March 31, 2026) 📊 Stock Screeners

Vishnu Prakash R Punglia Limited is an integrated infrastructure development and construction enterprise operating purely on an Engineering, Procurement, and Construction (EPC) contract framework. The company’s operating architecture deliberately bypasses capital-heavy concession formats such as Hybrid Annuity Model (HAM) or Build-Operate-Transfer (BOT), eliminating equity tie-ups in operational toll assets and long-gestation commercial concessions.

CORE BUSINESS SEGMENTS:
  • Water Treatment & Transmission: Turnkey design and erection of high-capacity Water Treatment Plants (WTP), rapid gravity filtration units, chemical dosing houses, raw water intake wells in riverbeds and reservoirs, transmission trunk pipelines (Ductile Iron, Mild Steel, and HDPE), clear water pumping stations, and distribution pipelines reaching end-consumer household tap connections.
  • Wastewater Infrastructure: Specialized municipal wastewater schemes, including automated Sewage Treatment Plants (STP) using Sequencing Batch Reactor (SBR) technology, underground sewerage networks, interceptor sewers, effluent pumping installations, and septage management systems under urban renewal frameworks like AMRUT 2.0.
  • Railway Formations & Structures: Heavy civil works for North Western Railway and West Central Railway, spanning civil embankment earthwork, blanketing, bridge substructures, PSC girder superstructures, track linking, level crossings, ballast profiling, and station master control buildings.
  • Roads & Over-Bridges: EPC execution of asphalt concrete and rigid cement concrete pavements, composite girder Road Over Bridges (ROBs) over active railway corridors, structural drainage, and pedestrian underpasses.
Metrics for FY 2025-26 Ended Mar 31, 2026
PROFIT & LOSS METRICS (₹ CR)
Revenue
₹851.20 Cr (▼ 31.2%)
Prev Year: ₹1,237.42 Cr
Gross Profit
₹502.74 Cr (▼ 45.8%)
Prev Year: ₹927.93 Cr
Operating Profit
-₹113.61 Cr (▼ N/M)
Prev Year: ₹139.53 Cr
Net Profit
-₹150.12 Cr (▼ N/M)
Prev Year: ₹58.60 Cr
Gross Margin
59.06 % (▼ 1593 bps)
Prev Year: 74.99 %
Operating Margin
-13.35 % (▼ 2462 bps)
Prev Year: 11.28 %
PAT Margin
-17.64 % (▼ 2237 bps)
Prev Year: 4.74 %
Asset Turnover
0.45x (▼ 0.16 pts)
Prev Year: 0.62x
RETURN & CAPITAL EFFICIENCY METRICS
ROE
-23.83 % (▼ 3135 bps)
Prev Year: 7.52 %
ROCE
-16.28 % (▼ 3246 bps)
Prev Year: 16.18 %
ROA
-7.98 % (▼ 1090 bps)
Prev Year: 2.92 %
Cash ROE
22.50 % (▲ 4905 bps)
Prev Year: -26.55 %
Cash ROCE
20.31 % (▲ 4431 bps)
Prev Year: -24.00 %
BALANCE SHEET METRICS (₹ CR)
Total Assets
₹1,880.27 Cr (▼ 6.4%)
Prev Year: ₹2,009.58 Cr
Current Assets
₹1,586.43 Cr (▼ 8.7%)
Prev Year: ₹1,736.87 Cr
Total Liabilities
₹1,250.30 Cr (▲ 1.6%)
Prev Year: ₹1,230.27 Cr
Current Liabilities
₹1,182.21 Cr (▲ 3.0%)
Prev Year: ₹1,147.37 Cr
Total Equity
₹629.95 Cr (▼ 19.2%)
Prev Year: ₹779.31 Cr
Working Capital
₹404.22 Cr (▼ 31.4%)
Prev Year: ₹589.50 Cr
Current Ratio
1.34x (▼ 0.17 pts)
Prev Year: 1.51x
Total Debt
₹649.55 Cr (▼ 8.2%)
Prev Year: ₹707.23 Cr
Debt to Equity
1.03x (▲ 0.12 pts)
Prev Year: 0.91x
Debt to Assets
0.35x (▼ 0.01 pts)
Prev Year: 0.35x
Equity Multiplier
2.98x (▲ 0.41 pts)
Prev Year: 2.58x
CASH FLOW METRICS (₹ CR)
Operating Cash Flow
₹141.77 Cr (▲ N/M)
Prev Year: -₹206.90 Cr
CapEx
₹28.92 Cr (▼ 61.1%)
Prev Year: ₹74.34 Cr
Free Cash Flow
₹112.85 Cr (▲ N/M)
Prev Year: -₹281.24 Cr
FCF Margin
13.26 % (▲ 3599 bps)
Prev Year: -22.73 %
CF to Debt
0.22x (▲ 0.51 pts)
Prev Year: -0.29x

📋 Quick Facts / Company Snapshot: Vishnu Prakash R Punglia Limited (NSE: VPRPL | BSE: 543974)

Attribute Disclosed Detail
Official Company Name Vishnu Prakash R Punglia Limited
Corporate Identity Number (CIN) L45203MH2013PLC243252
ISIN INE0AE001013
Stock Exchange Listing NSE: VPRPL | BSE: 543974
Date of Incorporation / Founding Year May 13, 2013 (Originally founded as a partnership firm on August 14, 1986)
Founders / Key Founding Figures Vishnu Prakash Punglia and Manohar Lal Punglia
Registered Office Unit No. 3, 5th Floor, B Wing, Trade Star Premises Co-Operative Society Limited, Village Kondivita, Mathuradas Vasanji Road, Near Chakala Metro Station, Andheri (East), Mumbai – 400059, Maharashtra, India
Corporate Headquarters B-31/32, Second Floor, Industrial Estate, New Power House Road, Jodhpur – 342003, Rajasthan, India
Telephone & Investor Relations Email +91-0291-2434396 | info@vprp.co.in / accounts@vprp.co.in / Compliance@vprp.co.in
Chairperson & Executive Leadership Vishnu Prakash Punglia (Chairperson & Whole-Time Director), Manohar Lal Punglia (Managing Director), Sanjay Kumar Punglia (Chief Executive Officer & Whole-Time Director)
Chief Financial Officer & Company Secretary Vinod Kumar Pungliya (CFO, appointed w.e.f. July 6, 2026; Sarfaraz Ahmed resigned June 30, 2026) | Monica Purohit (CS & Compliance Officer, appointed w.e.f. July 1, 2026; Nitisha Jain resigned June 30, 2026)
Promoter & Holding Group Punglia Family (Vishnu Prakash Punglia, Manohar Lal Punglia, Sanjay Kumar Punglia, Kamal Kishor Pungalia, Ajay Pungalia)
Industry / Sector Classification Civil Construction & Infrastructure EPC (NIC 36000: Water Supply; NIC 42101: Roads; NIC 42102: Railways; NIC 42909: Sewerage & Other Civil Works)
Workforce Composition & Attrition 9,652 Total Personnel: 1,162 Permanent Employees, 60 Non-Permanent Employees, 8,400 Permanent Workers, 30 Non-Permanent Workers | Employee Turnover Rate: 42%
Operational Footprint 43 Total Locations: 33 Project Sites / Plants and 10 Corporate / Regional Offices across 11 States and 1 Union Territory
Credit Ratings & Rating Agency CARE EDGE Ratings Limited: Long-Term Bank Facilities (₹200.00 Cr): CARE BB+; Negative (downgraded from CARE BBB-; Stable) | Long-Term / Short-Term Facilities (₹760.00 Cr): CARE BB+; Negative / CARE A4+ (downgraded from CARE BBB-; Stable / CARE A3)
Statutory, Secretarial & Cost Auditors Statutory: M/s Banshi Jain & Associates, CAs | Secretarial: GMJ & Associates, Company Secretaries | Cost: M/s Rajendra Singh Bhati & Co., Cost Accountants | Internal: M/s R.G. Maheshwary & Co., CAs
Registrar & Share Transfer Agent (RTA) MUFG Intime India Private Limited, C-101, 1st Floor, 247 Park, Lal Bahadur Shastri Marg, Vikhroli (West), Mumbai – 400083, Maharashtra

🏢 The Corporate Identity: Vishnu Prakash R Punglia Overview, Promoters & History

The Big Picture: Business Model & Core Value Proposition

Vishnu Prakash R Punglia Limited is an integrated infrastructure development and construction enterprise operating purely on an Engineering, Procurement, and Construction (EPC) contract framework. The company’s operating architecture deliberately bypasses capital-heavy concession formats such as Hybrid Annuity Model (HAM) or Build-Operate-Transfer (BOT), eliminating equity tie-ups in operational toll assets and long-gestation commercial concessions. Instead, the company focuses exclusively on sovereign, municipal, and public sector engineering mandates, executing turnkey works encompassing Water Supply Projects (WSP), railway lines, earthworks, road networks, and institutional civil infrastructure.

VPRPL’s competitive foundation is anchored in backward integration and asset-backed self-sufficiency. The company maintains an owned equipment fleet comprising approximately 500 units of heavy construction machinery, batch mixing concrete plants, wet mix macadam facilities, transit mixers, earth-moving assets, and drilling machinery. By retaining project design, engineering, survey, testing, and fleet operations entirely in-house, VPRPL minimizes margin leakages to third-party equipment lessors, maintains stringent quality compliance across remote geographies, and controls project execution timelines across the multi-state infrastructure landscape of India.

The Founders, Promoters & Their Legacy

The entrepreneurial foundation of VPRPL traces back to the Punglia family in Jodhpur, Rajasthan, headed by Vishnu Prakash Punglia, who has accrued four decades of expertise in infrastructure execution, public sector client relations, and turnkey water supply networks. Under his stewardship, the entity transitioned from a regional contracting outfit to a pan-India public EPC contractor. The leadership cohort comprises second- and third-generation executive family promoters holding formal technical and commercial credentials:

  • Vishnu Prakash Punglia (Chairperson & Whole-Time Director, DIN: 02162019): Leads overarching corporate strategy, policy formulation, governmental client liaison, and macro bidding processes, with over 38 years of sectoral experience in turnkey pipeline engineering.
  • Manohar Lal Punglia (Managing Director, DIN: 02161961): Holds 31 years of execution experience in water supply systems, orchestrating company-wide operational monitoring, technical reviews, site planning, budgeting, and plant logistics.
  • Sanjay Kumar Punglia (Chief Executive Officer & Whole-Time Director, DIN: 02162102): Civil engineer holding B.Tech and M.Tech degrees with 18 years of experience, heading the centralized in-house engineering and value-design division and supervising tender estimation and bid engineering.
  • Kamal Kishor Pungalia (Whole-Time Director, DIN: 02168426): Holds a Technical Engineering qualification from ICE (I) under the Ministry of Human Resource Development with 21 years of experience, heading Central Government portfolios spanning Indian Railways, DRDA, NHAI, and Military Engineer Services (MES).
  • Ajay Pungalia (Whole-Time Director, DIN: 02162190): Commerce graduate from Jai Narayan University, Jodhpur, with 18 years of turnkey execution experience, heading commercial finance, capital budgeting, and banking relationships.

The Journey: Corporate History & Key Milestones

The company commenced operations on August 14, 1986, as a partnership firm named M/s Vishnu Prakash Pungalia under the Indian Partnership Act, 1932. Reconstituted periodically to induct family partners and expand capital bases—transitioning to M/s Vishnu Prakash R. Pungalia in April 1999 and briefly M/s Shree Ji Construction Co. in June 2001 before reverting to its established title in March 2002—the partnership developed deep engineering capabilities in canal, pipeline, and urban distribution works across western Rajasthan.

On April 1, 2013, the business was formally corporatized and converted into a public limited entity under Part IX of the Companies Act, 1956, receiving its certificate of incorporation from the Registrar of Companies, Maharashtra, Mumbai, on May 13, 2013. The company achieved major qualification leaps post-incorporation, securing its first standalone railway project valued at ₹18.89 Crores in FY 2014-15, securing AA Class contractor registration with the Public Health Engineering Department (PHED) of Rajasthan, and earning research design certification with RDSO. In September 2023, VPRPL completed an Initial Public Offering (IPO) comprising a fresh issue of ₹308.61 Crores, which was oversubscribed 87.82 times, listing its equity shares on both the NSE and BSE on September 5, 2023.

The Corporate Umbrella & Group Structure

VPRPL operates as a standalone operational company without any direct subsidiaries, joint venture companies, or associate corporate entities. In terms of Section 129(3) and Schedule III of the Companies Act, 2013, the company does not have material corporate subsidiaries requiring consolidated balance sheet reporting. However, to execute high-value tenders requiring specialized technical credentials, the company operates extensively through 22 unincorporated Joint Operations (Association of Persons / unincorporated joint ventures), sharing scope, liabilities, and revenues on a proportional contractual basis.

⚙️ The Business Engine: Vishnu Prakash R Punglia Segments, Brands, Products & Operations

The Core Divisions & Segment Revenue Breakdown

The company is exclusively engaged in the business of infrastructure development and construction within India, which constitutes a single primary reporting segment under Ind AS 108 (Operating Segments). Operationally and internally, the Chief Operating Decision Maker (CODM)—consisting of the Managing Director and Chief Financial Officer—monitors business activities across four dedicated infrastructure divisions: Water Supply Projects (WSP), Railways, Road Infrastructure, and Sewerage / Other Civil Works.

Division / Infrastructure Segment NIC Code FY 2025-26 Revenue (₹ Cr) % Share of Total Revenue Operational Scope & Deliverables
Water Supply Projects (WSP) 36000 497.86 58.49% River intakes, raw water reservoirs, WTPs, cross-country pipeline networks, pumping stations, and overhead service reservoirs (OHSR).
Railway Infrastructure 42102 208.71 24.52% Track doubling, gauge conversion, earthwork formations, major/minor rail bridges, station redevelopment, and platform buildings.
Road Works & Highways 42101 96.36 11.32% State and national highways, road over-bridges (ROBs), road under-bridges (RUBs), culverts, and flexible/rigid pavements.
Sewerage, Civil & Other Works 42909 48.27 5.67% Sewage Treatment Plants (STPs), underground drainage networks, institutional administrative complexes, and power block civil structures.
Total Construction Business — 851.20 100.00% Comprehensive Turnkey EPC Operations

Revenue from operations for FY 2025-26 comprised contract services of ₹826.10 Crores (down from ₹1,229.47 Crores in FY 2024-25), sale of products of ₹12.32 Crores (versus ₹7.70 Crores in FY25), and other operating revenue from technical and professional services of ₹12.78 Crores (versus ₹0.25 Crores in FY25), reflecting an aggregate turnover of ₹851.20 Crores.

The Product & Service Catalog (with Operational KPIs, Order Book & Customer Concentration)

The company’s contract execution covers intricate engineering civil assets engineered to sovereign departmental specifications:

  • Water Treatment & Transmission: Turnkey design and erection of high-capacity Water Treatment Plants (WTP), rapid gravity filtration units, chemical dosing houses, raw water intake wells in riverbeds and reservoirs, transmission trunk pipelines (Ductile Iron, Mild Steel, and HDPE), clear water pumping stations, and distribution pipelines reaching end-consumer household tap connections.
  • Wastewater Infrastructure: Specialized municipal wastewater schemes, including automated Sewage Treatment Plants (STP) using Sequencing Batch Reactor (SBR) technology, underground sewerage networks, interceptor sewers, effluent pumping installations, and septage management systems under urban renewal frameworks like AMRUT 2.0.
  • Railway Formations & Structures: Heavy civil works for North Western Railway and West Central Railway, spanning civil embankment earthwork, blanketing, bridge substructures, PSC girder superstructures, track linking, level crossings, ballast profiling, and station master control buildings.
  • Roads & Over-Bridges: EPC execution of asphalt concrete and rigid cement concrete pavements, composite girder Road Over Bridges (ROBs) over active railway corridors, structural drainage, and pedestrian underpasses.
  • Industrial & Institutional Civil Structures: Specialized architectural complexes, including the 1×800 MW power block civil, structural, and architectural works at NTPC Sipat for BHEL, and multi-storey institutional knowledge hubs.

As of March 31, 2026, VPRPL’s order book stood at ₹4,391.09 Crores, providing solid multi-year revenue visibility of approximately 2 to 3 years. During FY 2025-26, the company secured three new contract awards with a cumulative bid project cost of ₹114.81 Crores, while successfully completing six projects totaling ₹362.87 Crores in delivered value. The customer base consists almost entirely of central, state, and parastatal governmental entities, such as the Public Health Engineering Department (PHED) Rajasthan, Uttarakhand Urban Sector Development Agency (UUSDA), Madhya Pradesh Jal Nigam, State Water and Sanitation Mission (SWSM) Uttar Pradesh, Public Works Department (PWD) Manipur, North Western Railway, Jaipur Development Authority, and Bharat Heavy Electricals Limited (BHEL).

Flagship Project Mandate Under Execution Awarding Authority / Client Disclosed Contract Value (₹ Cr) Infrastructure Segment Geographic Location
Hindoli–Nainwa Water Supply Project PHED, Rajasthan 694.40 Water Supply Infrastructure District Bundi, Rajasthan
Chillar Dam Multi-Village Drinking Water Scheme Madhya Pradesh Jal Nigam 634.40 Surface Water Treatment & Supply Madhya Pradesh
Haldwani Water Supply Development System UUSDA 525.50 Source, WTP & Urban Network Haldwani, Uttarakhand
Prayagraj Yamuna Multi-Group Village Scheme SWSM, Uttar Pradesh 496.00 Cluster Piped Water Scheme Yamuna Belt, Uttar Pradesh
Rural Water Supply Programme, Manipur PWD, Government of Manipur 433.30 Hilly Piped Water Distribution Manipur, Northeast
Kotdwar Water Supply & Long-Term O&M UUSDA 373.20 Turnkey WSP with Long-Term O&M Kotdwar, Uttarakhand
Redevelopment of Udaipur Railway Station North Western Railway 304.10 Station Modernization & Civil EPC Udaipur, Rajasthan
Ajmer–Chanderiya Doubling Project North Western Railway 269.70 Track Doubling, Bridges & Earthwork Rajasthan Corridor
NTPC Sipat 1×800 MW Power Block Civil Works Bharat Heavy Electricals Limited 247.60 Power Block Structural & Civil Sipat, Chhattisgarh
Amrit Bharat Station Scheme, Jodhpur Division North Western Railway 165.90 Station Connectivity & Amenities Jodhpur Division, Rajasthan
Rajiv Gandhi Knowledge Service & Innovation Hub RISL (RajCOMP Info Services Ltd) 160.50 Institutional Campus & MEP Jodhpur, Rajasthan
Pushkar–Merta EPC Railway Contract North Western Railway 88.60 Rail Line Construction Rajasthan
Jaipur–Sawai Madhopur ROB / Civil Works Jaipur Development Authority 77.90 Road Over Bridge Infrastructure Jaipur, Rajasthan

Mapping the Domestic & Global Reach (India vs. Exports)

VPRPL functions purely within the domestic Indian territory, executing projects across eleven States and one Union Territory: Rajasthan, Madhya Pradesh, Uttar Pradesh, Uttarakhand, Haryana, Gujarat, Maharashtra, Chhattisgarh, Assam, Manipur, and Goa. In accordance with disclosures in Section 134(3)(m) and the BRSR report, the company did not engage in export activities during FY 2025-26, recording zero foreign exchange earnings and zero foreign exchange outgo.

Geographic Market FY 2025-26 Revenue (₹ Cr) % Share of Total Revenue Key Operational States Covered
Domestic (India) 851.20 100.00% Rajasthan, MP, UP, Uttarakhand, Manipur, Chhattisgarh, Gujarat, Maharashtra, Goa, Haryana, Assam
International (Exports) 0.00 0.00% None (Zero foreign exchange outgo or earnings)
Total Market Reach 851.20 100.00% 11 States & 1 Union Territory

The Brick & Mortar Footprint: Manufacturing Plants, R&D & Offices

The company maintains a physical operating footprint of 43 separate operating facilities, comprising 33 project sites and industrial plants alongside 10 regional administrative hubs. VPRPL operates an extensive proprietary network of Ready Mix Concrete (RMC) batch mixing facilities, wet mix macadam plants, and casting yards distributed adjacent to major execution corridors:

  • RMC Batch Mixing Plants: Stationed at Hindoli Nainwa (Kota), SEI Tunnel (Pindwara), Jodhpur, Jaipur, Barmer, Bikaner, Ajmer, Mandal, Hamirgarh, Udaipur, Jalore, Churu, Nasirabad, Pushkar (all in Rajasthan); Dehradun (Uttarakhand); Prayagraj (Uttar Pradesh); Haryana; Shajapur (Madhya Pradesh); Ambaji (Gujarat); and Goa.
  • Wet Mixing Macadam (WMM) & Asphalt Plants: Located at Rakhi (covering the Balotra-to-Sanderao highway and Jalore Road Over Bridge projects) and the Netra Factory site in Jaipur.
  • Central Machinery & Industrial Storage: Maintained across proprietary industrial yards, including Mini Growth Centre Phase II, Sangaria, Jodhpur; Industrial Area Abu Road; and Agro Food Park, Boranada, Jodhpur.
  • Corporate & Registered Offices: Registered legal office at Trade Star, Andheri (East), Mumbai; centralized corporate headquarters at Industrial Estate, New Power House Road, Jodhpur.

📊 The Financial Health: Vishnu Prakash R Punglia Financial Statements & Numbers Simplified

Multi-Year Financial Highlights (₹ in Crores)

A multi-year review of VPRPL’s financial trajectory reflects the sharp contraction witnessed in FY 2025-26 as departmental work certification and disbursement backlogs peaked, juxtaposed against rapid growth in preceding fiscal years following its initial public offering.

Financial Metric FY 2025-26 FY 2024-25 Latest YoY (%)
Revenue from Operations 851.20 1,237.42 -31.21%
Other Income 10.20 8.78 +16.17%
Total Income 861.40 1,246.20 -30.88%
Operating Profit / EBITDA (71.88) 164.24 N/M
EBITDA Margin (%) -8.44% 13.27% –
Profit / (Loss) Before Tax (PBT) (177.26) 80.52 N/M
Profit / (Loss) After Tax (PAT) (150.12) 58.60 N/M
Net Worth / Total Equity 629.95 779.31 -19.17%
Total Borrowings (Debt) 649.55 707.23 -8.16%
Net Cash from Operating Activities 141.77 (206.90) N/M
Order Book (at Year-End) 4,391.09 — –

Earnings, Expenses, & Take-Home Profits (Statement of Profit & Loss)

The Statement of Profit and Loss demonstrates the compression in operational margins resulting from under-absorption of plant depreciation, extended site overheads, high borrowing finance costs, and expected credit loss allowances.

Statement of Profit and Loss (Ind AS Schedule III) FY 2025-26 (₹ Cr) FY 2024-25 (₹ Cr) Latest YoY (%)
Revenue from Operations 851.20 1,237.42 -31.21%
Other Income 10.20 8.78 +16.17%
Total Income (I + II) 861.40 1,246.20 -30.88%
Expenses
Cost of Materials Consumed 402.32 643.95 -37.52%
Changes in Inventories of Work-in-Progress (53.86) (334.46) -83.90%
Construction Expenses 432.82 668.63 -35.27%
Employee Benefits Expense 63.10 49.61 +27.19%
Finance Costs 73.85 67.79 +8.94%
Depreciation and Amortisation Expense 21.57 15.92 +35.49%
Other Expenses 88.90 54.23 +63.93%
Total Expenses (IV) 1,028.70 1,165.67 -11.75%
EBITDA (Calculated: Operating PBT + Fin Costs + Depr – Other Income) (71.88) 164.24 N/M
Operating Profit / EBIT (PBT + Finance Costs – Other Income) (113.61) 139.53 N/M
Profit / (Loss) Before Exceptional Items & Tax (III – IV) (167.30) 80.52 N/M
Exceptional Items 9.96 0.00 N/M
Profit / (Loss) Before Tax (PBT) (177.26) 80.52 N/M
Tax Expense: Current Tax 0.94 30.98 -96.97%
Tax Expense: Deferred Tax (Credit) / Charge (28.08) (9.05) +210.28%
Total Tax Expense / (Benefit) (27.14) 21.93 N/M
Profit / (Loss) After Tax (PAT) for the Year (150.12) 58.60 N/M
Other Comprehensive Income / (Loss) (Net of Tax) 0.76 (0.35) N/M
Total Comprehensive Income / (Loss) for the Year (149.36) 58.25 N/M
Basic & Diluted Earnings Per Share (Face Value ₹10/- each) in ₹ (12.04) 4.70 N/M

Revenue distribution across FY 2025-26 broke down quarterly to ₹276.40 Crores in Q1, ₹295.70 Crores in Q2, ₹177.50 Crores in Q3, and ₹101.60 Crores in Q4. Execution momentum stalled significantly during the fourth quarter as departmental fund releases slowed to industry-wide lows. Consequently, the company recorded a Loss Before Tax of ₹151.77 Crores in Q4 alone, impacted by ₹65.24 Crores in expected credit loss provisioning, ₹17.65 Crores in billing reversals on unapproved variations, ₹31.00 Crores in idle overhead absorption, and a ₹9.96 Crores exceptional charge for the rescinded Jaipur–Sawai Madhopur doubling contract.

Assets, Borrowings, & Net Worth (Statement of Balance Sheet)

The Balance Sheet displays the substantial expansion in gross equipment assets and the adjustments made to working capital and promoter funding structures.

Balance Sheet (Ind AS Schedule III) As at March 31, 2026 (₹ Cr) As at March 31, 2025 (₹ Cr) Latest YoY (%)
ASSETS
Non-Current Assets
Property, Plant and Equipment (PPE) 227.46 221.62 +2.64%
Capital Work-in-Progress (CWIP) 3.20 7.16 -55.31%
Other Intangible Assets 12.36 0.20 +6080.00%
Intangible Assets Under Development 0.28 0.20 +40.00%
Investment Property 9.05 9.16 -1.20%
Non-Current Financial Assets: Investments 0.00 1.36 -100.00%
Non-Current Financial Assets: Other Financial Assets 6.66 21.06 -68.38%
Deferred Tax Assets (Net) 33.69 5.57 +504.85%
Other Non-Current Assets 1.14 6.38 -82.13%
Total Non-Current Assets 293.84 272.71 +7.75%
Current Assets
Inventories 782.55 798.03 -1.94%
Trade Receivables 576.77 734.70 -21.50%
Cash and Cash Equivalents 0.82 5.34 -84.64%
Other Bank Balances 54.88 52.14 +5.26%
Loans & Advances 15.29 8.11 +88.53%
Other Current Financial Assets 8.54 13.30 -35.79%
Current Tax Assets (Net) 23.13 4.46 +418.61%
Other Current Assets 124.45 120.79 +3.03%
Total Current Assets 1,586.43 1,736.87 -8.66%
TOTAL ASSETS 1,880.27 2,009.58 -6.43%
EQUITY AND LIABILITIES
Equity
Equity Share Capital 124.64 124.64 0.00%
Other Equity 505.31 654.67 -22.81%
Total Equity / Net Worth 629.95 779.31 -19.17%
Non-Current Liabilities
Non-Current Borrowings 59.45 80.05 -25.73%
Other Financial Liabilities (Mining Rights Payable) 5.29 0.00 N/M
Provisions (Gratuity) 3.35 2.85 +17.54%
Total Non-Current Liabilities 68.09 82.90 -17.86%
Current Liabilities
Current Borrowings 590.09 627.18 -5.91%
Trade Payables: Micro and Small Enterprises (MSME) 108.51 47.92 +126.44%
Trade Payables: Other than MSME 403.76 394.13 +2.44%
Other Financial Liabilities 21.75 11.08 +96.30%
Other Current Liabilities (Contract Advances & Statutory Dues) 57.49 63.55 -9.54%
Provisions (Gratuity) 0.61 0.47 +29.79%
Current Tax Liabilities (Net) 0.00 3.04 -100.00%
Total Current Liabilities 1,182.21 1,147.37 +3.04%
Total Liabilities 1,250.30 1,230.27 +1.63%
TOTAL EQUITY AND LIABILITIES 1,880.25 2,009.58 -6.44%

Working Capital Cycle & Schedule III Statutory Ratio Explanations

Due to severe funding compression in Jal Jeevan Mission releases, certification cycles slowed down, extending working capital days. Management addressed cash flow requirements through promoter unsecured advances and positive operating cash collections.

Financial Ratio Metric FY 2025-26 FY 2024-25 Mandatory Schedule III Variance Explanation Latest YoY (%)
Current Ratio 1.34 times 1.51 times Maintained within normal operational parameters. –
Debt-to-Equity Ratio 1.03 times 0.91 times Slight uptick due to reduction in Net Worth from reported annual PAT loss. –
Debt Service Coverage Ratio (DSCR) -0.47 times 1.27 times Incurrence of net operational loss before taxes during the reporting period. –
Return on Equity (ROE) -23.83% 7.52% Impacted directly by the net loss incurred in operations for FY 2025-26. –
Inventory Turnover Ratio 0.99 times 1.55 times Slowdown in project execution cycles and delayed work certification approvals. –
Trade Receivables Turnover Ratio 1.30 times 1.76 times Extended payment release cycles from state and parastatal government authorities. –
Trade Payables Turnover Ratio 1.60 times 3.37 times Slower procurement disbursements to sub-contractors and vendors mirroring departmental inflows. –
Net Capital Turnover Ratio 2.11 times 2.10 times Remained stable as working capital contracted parallel to operating turnover. –
Net Profit Ratio 150.12 4.70% Subdued top-line revenue combined with fixed site overheads, finance costs, and ECL charges. –
Return on Capital Employed (ROCE) -16.28% 16.18% Operational loss incurred across infrastructure execution sites. –
Return on Investment (ROI) 11.94% -0.05% Liquidation and capital gains realised on mutual fund investments through OCI. –

Cash Flow: Tracking the Money Movement

Despite the operational accounting loss, the company generated ₹141.77 Crores in Net Cash from Operating Activities, reversing the operational cash burn of ₹206.90 Crores in FY 2024-25. This turnaround funded bank deleveraging initiatives.

Statement of Cash Flows (Ind AS Schedule III) FY 2025-26 (₹ Cr) FY 2024-25 (₹ Cr) Latest YoY (%)
Net Cash Generated from / (Used in) Operating Activities (A) 141.77 (206.90) N/M
Purchase of Property, Plant and Equipment & CWIP (CapEx) 28.92 74.34 -61.10%
Sale Proceeds from Property, Plant and Equipment -16.28% 16.18% –
Redemption / (Purchase) of Other Bank Deposits & Mutual Funds (1.38) (20.44) -93.25%
Interest and Rental Incomes Received 7.69 8.40 -8.45%
Net Cash Generated from / (Used in) Investing Activities (B) (20.64) (86.13) -76.04%
Proceeds / (Repayments) of Long-Term & Short-Term Borrowings -16.28% 16.18% –
Net Unsecured Loan Receipts from Promoters & Directors 258.81 25.26 +924.58%
Finance Charges & Bank Interest Paid (73.85) (67.79) +8.94%
Repayment of TReDS and Working Capital Lines (328.00) — –
Net Cash Generated from / (Used in) Financing Activities (C) (125.65) 289.49 N/M
Net Increase / (Decrease) in Cash & Cash Equivalents (A + B + C) (4.52) (3.54) +27.68%
Cash and Cash Equivalents at the Beginning of the Year 5.34 8.88 -39.86%
Cash and Cash Equivalents at the End of the Year 0.82 5.34 -84.64%

Funding the Future: CapEx, CWIP, R&D Intensity & Net Foreign Exchange

Gross additions to Property, Plant, and Equipment totaled ₹28.92 Crores during FY 2025-26, compared to ₹74.34 Crores in FY 2024-25. The additions focused primarily on plant and equipment (₹23.95 Crores) and building infrastructure (₹2.58 Crores) to support active project commitments. Capital Work-in-Progress stood at ₹3.19 Crores as at March 31, 2026, comprising ongoing institutional building construction. The company amortized intangible assets and software development of ₹0.41 Crores. In accordance with Section 134(3)(m), VPRPL conducts no commercial laboratory research and development activities, and reported zero foreign exchange earnings and zero foreign exchange outgo.

👥 Power & Control: Vishnu Prakash R Punglia Governance, Leadership & Shareholding Pattern

The Brain Trust: Board of Directors & Key Managerial Personnel (KMP)

The Board of Directors comprises eleven directors, reflecting an operational mix of five executive promoter directors and six non-executive independent directors, including one independent woman director.

Name of Director / KMP Designation / Role DIN Category
Vishnu Prakash Punglia Chairperson & Whole-Time Director 02162019 Promoter & Executive Director
Manohar Lal Punglia Managing Director 02161961 Promoter & Executive Director
Sanjay Kumar Punglia Chief Executive Officer & Whole-Time Director 02162102 Promoter & Executive Director
Kamal Kishor Pungalia Whole-Time Director 02168426 Promoter & Executive Director
Ajay Pungalia Whole-Time Director 02162190 Promoter & Executive Director
Nilima Bhansali Non-Executive Independent Director 08197422 Independent Women Director
Krishan Murari Lal Mathur Non-Executive Independent Director 08402786 Independent Director
Uttam Chand Singhvi Non-Executive Independent Director 06944435 Independent Director (Audit Committee Chair)
Ratan Lahoti Non-Executive Independent Director 09773137 Independent Director
Surendra Sharma Non-Executive Independent Director 09784472 Independent Director (SRC Chair)
Anurag Lohiya Non-Executive Independent Director 09257950 Independent Director
Vinod Kumar Pungliya Chief Financial Officer (w.e.f. July 6, 2026) KMP Key Managerial Personnel
Monica Purohit Company Secretary & Compliance Officer (w.e.f. July 1, 2026) ACS 37179 Key Managerial Personnel

Inter-se promoter relationships: Vishnu Prakash Punglia is the father of Ajay Pungalia. Manohar Lal Punglia, Sanjay Kumar Punglia, and Kamal Kishor Pungalia are brothers, and are the nephews of Vishnu Prakash Punglia. Executive compensation for FY 2025-26 stood at ₹1.06 Crores each for Vishnu Prakash Punglia and Manohar Lal Punglia, and ₹0.86 Crores each for Sanjay Kumar Punglia, Kamal Kishor Pungalia, and Ajay Pungalia. Independent Directors received sitting fees only, ranging from ₹0.006 Crores to ₹0.017 Crores.

Who Owns the Stock? Shareholding Pattern

During FY 2025-26, the promoter and promoter group divested a 23.20% equity stake in the secondary market to provide ₹466.17 Crores in emergency interest-free unsecured loans to support operational liabilities and debt retirement. Consequently, the promoter group holding stood at 44.61% as of March 31, 2026, down from 67.81% on March 31, 2025.

Category of Shareholder Number of Equity Shares Held % of Issued Share Capital
Promoter & Promoter Group 5,55,98,276 44.61%
Mutual Funds 50,87,858 4.08%
Foreign Portfolio Investors (FPI Category I & II) 3,36,127 0.27%
Central Government / President of India 3,00,006 0.24%
Resident Individuals (Capital up to ₹0.0200 Crores) 4,49,44,451 36.06%
Resident Individuals (Capital exceeding ₹0.0200 Crores) 1,14,81,808 9.21%
Bodies Corporate 31,15,517 2.50%
Non-Resident Indians (NRIs) 10,14,037 0.81%
Key Managerial Personnel & Others 27,65,920 2.22%
Total Issued Share Capital 12,46,44,000 100.00%

Individual shareholdings among promoters as of March 31, 2026, comprise: Vishnu Prakash Punglia: 1,06,75,000 shares (8.56%); Manohar Lal Punglia: 82,20,000 shares (6.59%); Ajay Pungalia: 66,50,000 shares (5.34%); Kamal Kishor Pungalia: 56,50,000 shares (4.53%); and Sanjay Kumar Punglia: 53,49,883 shares (4.29%).

🗺️ The Corporate Family Tree: Group Structure, Ratings & Contingent Liabilities

Subsidiaries, Associates, & Joint Ventures (Form AOC-1)

VPRPL holds no incorporated subsidiaries or associate corporate entities. To bid for and execute complex civil engineering works, the company participates in 22 unincorporated Joint Operations (AOPs), accounting for its direct share of jointly held assets, liabilities, and revenues:

Unincorporated Joint Operation Entity Jurisdiction Proportion of Company Interest (%) Key Mandate / Engineering Scope
VPRPL-CIPEL JV India 90.00% Large-Scale Water Pipeline Works
VPRPL-KCC JV India 76.00% Specialized Heavy Civil Infrastructure
VPRPL-CIPEL AMBAJI JV India 74.00% Ambaji Regional Water Infrastructure
VPRPL-KSIPL UDAIPUR JV India 74.00% Udaipur Railway Station Redevelopment
VPRPL KSIPL BKN JV India 74.00% Bikaner Railway Station Upgradation
VPRPL-RBIPL JDA JV India 70.00% Jaipur Development Authority Civil Works
VPRPL-MCL JV India 60.00% Water Supply Construction
VPRPL-KALPATRU JV India 60.00% Turnkey Contract (Under Dispute)
VPRPL-KCLPL HARRA JV India 60.00% Water Supply Distribution Scheme
VPRPL-SMCC JV India 60.00% Pipeline & Water Treatment Works
VPRPL-SSNR JV India 60.00% Civil & Road Infrastructure Works
VPRPL-SMCC JAISALMER JV India 60.00% Jaisalmer Regional Pipeline Mandate
VPRPL-B&G JV India 60.00% Infrastructure Development Works
VPRPL-VI JV India 51.00% Road & Urban Water Supply
VPRPL-VI BHILWARA JV India 51.00% Bhilwara Water Pipeline Distribution
VPRPL-RBIPL JV India 49.00% Turnkey Pipeline Construction
VPRPL-RBIPL JAWALI JV India 49.00% Jawali Water Network Mandate
VPRPL-RBIPL RANI JV India 49.00% Rani Regional Water Supply Works
VPRPL-PEL JV India 49.00% Civil & Water Engineering Works
VPRPL-SBEL JV India 49.00% Ajmer-Chanderiya Rail Doubling
VPRPL WABAG JV India 42.24% Advanced Water & Wastewater Treatment
VI VPRPL -JV India 20.00% Road & Municipal Infrastructure Works

Strategic Investments, Credit Ratings, Banking Consortium & Contingent Liabilities

Working capital banking arrangements are managed under a consortium led by Bank of Baroda alongside Punjab National Bank, Indian Bank, Yes Bank, and HDFC Bank. Credit ratings were reviewed by CARE EDGE Ratings Limited in FY 2025-26, which revised ratings on long-term bank facilities (₹200.00 Crores) to CARE BB+; Negative (from CARE BBB-; Stable) and long-term/short-term facilities (₹760.00 Crores) to CARE BB+; Negative / CARE A4+ (from CARE BBB-; Stable / CARE A3). The company has engaged an alternate credit rating agency for fresh assessment.

Contingent Liability & Financial Exposure Category As at March 31, 2026 (₹ Cr) As at March 31, 2025 (₹ Cr) Legal Basis & Current Status Latest YoY (%)
Bank Guarantees Furnished to Clients 492.15 576.42 Performance, advance, and bid guarantees issued across active EPC mandates. -14.62%
Indirect Tax Disputes (GST) 11.30 10.82 Contested GST assessments and departmental show-cause notices. +4.44%
Direct Income Tax Demands 2.17 1.63 Expense disallowances and tax credits pending appeal before CIT(A). +33.13%
Other Disputed Claims & Arbitrations 31.98 12.03 Includes contested encashments: Bikaner Station (₹19.95 Cr, stayed by HC) and Indore Smart City (₹12.03 Cr). +165.84%
Capital Commitments 0.98 8.62 Estimated contract value remaining to be executed on capital account. -88.63%
Total Contingent Financial Commitments 538.58 609.52 Off-Balance Sheet Operational Risk Profile -11.64%

Special legal disclosures in the Board’s Report confirm that during FY 2025-26, two operational creditors filed applications under Section 9 of the Insolvency and Bankruptcy Code (IBC) before the NCLT Mumbai Bench claiming operational dues aggregating ₹42.62 Crores. As of March 31, 2026, the petitions remain at the stage of filing objections/replies, with no order admitting insolvency proceedings passed. Furthermore, the company successfully secured an interim stay from the Rajasthan High Court regarding the ₹19.95 Crores bank guarantee forfeiture on the Bikaner Railway Station contract, while booking an exceptional credit loss charge of ₹9.96 Crores on the Jaipur–Sawai Madhopur contract termination.

🎯 The Strategic Outlook: Competitive Moats, Risks, Growth Plans & FAQs

Competitive Advantages & Economic Moats

  • In-House Integrated Execution Fleet: Maintaining an owned fleet of over 500 equipment units, mobile batching plants, and WMM setups enables VPRPL to avoid third-party leasing markups and execute projects efficiently in remote terrains.
  • AA Class Contractor Credentials & RDSO Accreditation: Top-tier sovereign vendor registrations with the Public Health Engineering Department of Rajasthan and North Western Railway enable independent bidding for large-scale mandates.
  • Technological Partnership Synergy: Collaborative joint operations with specialized technology providers—such as VA TECH WABAG in municipal wastewater filtration and SBR systems—allow the company to address complex treatment mandates.
  • Low Balance Sheet Concession Risk: Strict adherence to pure-play cash-contract EPC works shields VPRPL from equity lock-ins, traffic revenue shortfalls, and toll collection risks associated with BOT or HAM concession assets.

What Could Go Wrong? Key Challenges & Business Risks

  • Sovereign Payment Cycles & Working Capital Pressure: Reliance on government disbursements creates exposure to budgetary transitions, as seen in FY26 when Jal Jeevan Mission funding slowdowns extended collection days to 277 days.
  • Contractual Rescissions & Bank Guarantee Disputes: Rescissions on railway doubling works (Jaipur–Sawai Madhopur) and station upgrades (Bikaner) lead to disputed bank guarantee encashments and legal proceedings.
  • Credit Rating Downgrades & Non-Fund Limits: Revisions to CARE BB+; Negative impact non-fund-based bank guarantee issuance terms and working capital debt pricing.
  • Insolvency Applications Under IBC: Section 9 NCLT petitions by two operational creditors claiming ₹42.62 Crores represent legal risks requiring settlement or resolution.

The Next Chapter: Growth, Order Pipeline & CapEx Initiatives

The strategic roadmap for FY 2026-27 prioritizes clearing pending certification backlogs, realizing verified trade receivables, and converting the existing ₹4,391.09 Crores unexecuted order book into operating revenue and cash flow. Management has adopted a selective bidding strategy, targeting projects in established geographies where payment cycles remain reliable.

The Union Cabinet’s approval of Jal Jeevan Mission 2.0 on March 10, 2026, with an allocation of ₹8,69,000.00 Crores (central assistance of ₹3,59,000.00 Crores through December 2028), expands the company’s addressable pipeline. Under JJM 2.0, mandates emphasize complete service delivery and operations and maintenance (O&M)—aligning with VPRPL’s combined construction and O&M model (such as the ₹373.20 Crores Kotdwar project). Additionally, the Board has approved raising up to ₹300.00 Crores via equity or equity-linked instruments, alongside an increase in authorized share capital to ₹200.00 Crores, to restore balance sheet liquidity and deleverage debt.

The Verdict: Strategic Outlook & Conclusion

Vishnu Prakash R Punglia Limited weathered a difficult fiscal cycle in FY 2025-26, impacted by the interim pause between Jal Jeevan Mission phases, write-offs, and lengthened collection periods. However, generating positive operating cash flow of ₹141.77 Crores, reducing bank debt by ₹340.00 Crores with promoter support, and maintaining an intact unexecuted order book of ₹4,391.09 Crores demonstrate operational resilience. As JJM 2.0 and AMRUT 2.0 disburse capital, VPRPL’s backward-integrated asset base positions it for operational recovery.

Frequently Asked Questions (FAQs) About Vishnu Prakash R Punglia

Q1: What infrastructure sectors does Vishnu Prakash R Punglia Limited operate in?

Vishnu Prakash R Punglia Limited operates as an integrated EPC contractor across four primary infrastructure sectors: Water Supply Projects (WSP, including water treatment plants, intake wells, and distribution pipelines), Railway Infrastructure (track doubling, station redevelopment, and earthwork), Road Infrastructure (state/national highways, road over-bridges, and pavements), and Sewerage / Civil Works (STPs, drainage networks, and institutional structures). The company does not undertake BOT or HAM concession assets.

Q2: What were VPRPL’s revenue and profitability figures for FY 2025-26?

In FY 2025-26, VPRPL recorded revenue from operations of ₹851.20 Crores, down 31.21% compared to ₹1,237.42 Crores in FY 2024-25. The company recorded a Loss Before Tax of ₹177.26 Crores and a Net Loss After Tax of ₹150.12 Crores (basic EPS of -₹12.04), compared to a Net Profit After Tax of ₹58.60 Crores in FY 2024-25, primarily due to delayed Jal Jeevan Mission fund releases, project certification backlogs, and expected credit loss provisions.

Q3: Who are the primary promoters and managing directors of the company?

The company was founded and is led by the Punglia family based in Jodhpur, Rajasthan. Key leadership figures include Vishnu Prakash Punglia (Chairperson & Whole-Time Director), Manohar Lal Punglia (Managing Director), Sanjay Kumar Punglia (Chief Executive Officer & Whole-Time Director), Kamal Kishor Pungalia (Whole-Time Director), and Ajay Pungalia (Whole-Time Director). Promoters held a 44.61% equity stake in the company as of March 31, 2026.

Q4: What is the current size of VPRPL’s order book and where are its projects located?

As of March 31, 2026, VPRPL maintained a confirmed order book of ₹4,391.09 Crores across water, railway, and road sectors, providing 2 to 3 years of revenue visibility. The company executes projects across eleven Indian States and one Union Territory, including Rajasthan, Uttarakhand, Madhya Pradesh, Uttar Pradesh, Manipur, Chhattisgarh, Haryana, Gujarat, Maharashtra, Assam, and Goa.

Q5: What is VPRPL’s debt position, credit rating, and net worth?

As of March 31, 2026, VPRPL reported Total Borrowings of ₹649.55 Crores (comprising ₹59.45 Crores in non-current borrowings and ₹590.09 Crores in current borrowings, which includes ₹299.64 Crores in interest-free unsecured loans from promoters) and Total Equity / Net Worth of ₹629.95 Crores, representing a debt-to-equity ratio of 1.03 times. The company’s credit ratings from CARE EDGE Ratings Limited stand at CARE BB+; Negative for long-term bank facilities and CARE BB+; Negative / CARE A4+ for short-term facilities.